Our Projects

Harnessing Solar Innovation.Building a Cleaner, Brighter Future.

Project 1:

Off-Grid Solution

Client: Two Government Schools
Location: Abu Dhabi & Al Ain
Scope: 92 Solar-Powered Signage Installations
System Size: 1 -150 kwp On-Grid Solar Power Plant

We successfully implemented a sustainable off-grid solar signage solution for two educational institutions located in Abu Dhabi and Al Ain. A total of 92 signage units were installed, each equipped with high-efficiency solar panels and battery storage systems. These systems ensure uninterrupted performance, even during low sunlight conditions, enhancing visibility while promoting energy independence.
This eco-friendly initiative supports the UAE’s vision for sustainable infrastructure and clean energy adoption

Project 2:

Solar Power Plant – On-Grid System

Client: Joseph Decorative Metal
Location: Jebel Ali Industrial Area First
System Size: 150KWp On-Grid Solar Power Plant

For Joseph Decorative Metal, we delivered a 150KWp on-grid solar power system tailored to meet their industrial energy needs. Installed at their facility in Jebel Ali Industrial Area First, this project is designed to reduce grid dependency and operational costs.
The system seamlessly integrates with the DEWA grid, maximizing energy efficiency and enabling real-time monitoring. This project reflects our commitment to powering industrial growth through clean, renewable energy.